Showing posts with label fabrication. Show all posts
Showing posts with label fabrication. Show all posts
Saturday, June 8, 2013
Friday, January 11, 2013
Joint testing
for a multi-purpose connector, to speed up fabrication process for bamboo vaults similar to the bamboo workshop and smaller; as well as bamboo robots like the waterbot for Berekuso Hill Station.
Subscribe to:
Posts (Atom)




